GRIFFITH CONTRACTING, LLC
  • Home
  • Current/Past Performance
  • What We Do
  • Who We Represent
  • Contact
  • Home
  • Current/Past Performance
  • What We Do
  • Who We Represent
  • Contact
Search
Picture


Project Work History
MULTIPLE AWARD CONTRACTS
49.5 Million - USAF Tinker AFB, Multiple Award Contract Basic Ordering Agreement (MACB)
$1.3 Million - US Army Corps of Engineers, Tulsa District, Mowing Services (IDIQ), Opt Yr 4


Completed Multiple Award Contracts
$5.0 Million - US General Services Administration, Oklahoma (IDIQ)
$5.0 Million - US General Services Administration, Tul-Fay (IDIQ)

​PAST PERFORMANCE SUMMARY $26 MIL Cumulative

Key Projects:
$4,067,519 US Department of Transportation, Federal Aviation Administration, Tinker AFB OK Facility Upgrade and Site Renovations at Air Route Surveillance Radar OKC Site.

$474,551
US General Services Administration, Ed Edmondson Federal Courthouse, Muskogee OK Replace Active Vehicle Barriers to entrance and exit of Sally port for the US Courts and US Marshal.

$1,345,171
US Army Corps of Engineers, Tinker AFB OK Design Build Elevator Modernization - passenger elevator with new safety, controls, cab technologies.

$900,864
US General Services Administration, Tulsa Federal Courthouse, Tulsa OK Install Roof Tie In System and Fall Protection. New handrails, anchors, and arrest connections.

$687,736
US Air Force, Naval Strategic Communications Wing 1, Tinker AFB OK Renovate classrooms for TACOM. New transformers, electrical panels, communications, and 8 Ton HVAC.

$2,107,220
US Bureau Engraving & Printing, Fort Worth TX Design/build Replace Centrifuges - two decanter centrifuges, electrical, mechanical, and controls.

$316,896
National Park Service, Pea Ridge Military Site, Garfield AR Renovate Visitor Center - storefront windows and doors, automated lighting system, and reception center.

$1,599,999
Bureau Engraving & Printing, Fort Worth TX Elevator Modernization - Modernize five elevators with controls, operators, doors, electrical and fire alarm.

$3,005,588
US Air Force, 138th Fighter Wing, Tulsa OK Energy Controls HVAC - Basewide building automation system and HVAC repairs.

$1,137,322
US Air Force, 138th Fighter Wing, Tulsa OK B316 HVAC Repair - replace boiler, air handler, hot water systems, and install building automation.

$625,639
US Air Force, Tinker AFB OK Renovate Restrooms B3001G - renovate facility restrooms on two floors of Communication Squadron.

$968,089
US Air Force, 138th Fighter Wing, Tulsa OK Renovate Bldg 240 Headquarters - Complete renovation flooring, install accordion wall, and restrooms.

$426,428
US Air Force, 138th Fighter Wing, Tulsa OK Construct Parking Lots - Construct new mission training facility parking lot and repave another.

$193,880
US Air Force, 138th Fighter Wing, Tulsa OK Replace building 316 Chiller - 110 ton chiller, piping, controls, and variable frequency drives.

$226,816
US Air Force, 138th Fighter Wing, Tulsa OK Resurface Track - Rebuild running track with rubberized surface, widen bridge, and exercise equipment.

$417,168
US Air Force, 138th Fighter Wing, Tulsa OK Roof Retrofit Building 020 - Design build 20000 sf roof flat to standing seam with lightning protection.

​




Proudly powered by Weebly
  • Home
  • Current/Past Performance
  • What We Do
  • Who We Represent
  • Contact